Tile underlayment replacement
Your tile lifted, the failed underlayment replaced, the same tile re-laid.
$11,550 – $28,900
typical roof

We lift a tile and photograph what is under it before we quote you a number. Nobody should buy a roof on a guess made from the pavement.
A tile roof, in section
Everyone buys the top layer. The one in turquoise is the one that decides when your roof needs doing — and it is the only one you have never seen.
Chandler, AZEvery quote starts on the roof, not the driveway.
Three lifted tiles, photographed, before we give you a number.
Since 2011
Concrete tile outlives the house. We stage yours on site, re-lay the same tile, and cover breakage from matching stock at our cost up to 5% of the roof. Above that we tell you before we order anything.
Every job comes with
Sound familiar?
Pick the one that sounds like yours. Most of them do not mean a new roof, and we will tell you plainly when one does.
Usually a repairFrom $3502-5 hours
Water coming in right now?
Move what is underneath, put a container down, and if a ceiling is bulging with trapped water, stay out of that room and call us. Active leaks answered 24/7 through monsoon season, 15 June to 30 September.
Look inside the roof
Every roof is built in layers, and one of them wears out long before the rest. See which one it is on yours, and what replacing it costs.
Your roof
Building the roof…
The layers, top to bottom
This job: tile lift and re-lay
Tap any layer, on the model or in the list, to see what it does and how long it lasts in Arizona sun.
Before and after
Drag the handle. On the left, the roof we were called to: cracked tiles, slipped courses and gaps the monsoon rain gets into. On the right, the same roof after the repair, every tile whole and every course straight.


An illustration made with AI, not a photograph of a customer's home: one scene, shown before and after the kind of tile repair we do.
Before you price anything
Two questions, and you will know whether this is a job for this year or for the next decade. It will happily tell you to go away — most roofs we look at are not ready.
The clock
The dashed window is when this kind of roof typically needs doing in Arizona — 20 to 25 years.
Put a year in and this will tell you where you stand — including, quite often, that there is nothing to do for years.
This is an estimate from the age of the roof, not a diagnosis. Only lifting tile tells you the truth, and that part is free.
What we do
Press Book this and the service goes straight into the form with the price attached.
Your tile lifted, the failed underlayment replaced, the same tile re-laid.
$11,550 – $28,900
typical roof
A complete new tile system where the existing tile is past saving.
$17,850 – $47,600
typical roof
Tear-off and replace, for the East Valley homes that were never tiled.
$9,450 – $23,800
typical roof
The flat sections only, recoated properly: cleaned, primed, two coats, measured.
$750 – $11,000
typical flat roof
Find it, prove it with photographs, fix it. No upsell to a whole roof.
$350 – $2,500
typical repair
We lift tile in three places, photograph underneath, and tell you the years left.
Free
A working range, from the roof area and the system you have chosen. The written number comes after we have lifted tile and seen the deck, and it normally lands inside this range.
No charge, no obligation
We lift tile in three places, photograph what is underneath, and tell you how many years it has left. You get the photographs whether you buy anything or not.
The roofs we work on
Clay, concrete, S-tile, barrel, and the flat foam sections over the patio. Most East Valley homes are more than one of these, which is why one crew does the lot.








Illustrative photographs of the roof types we work on.
Around Chandler
Three roofers quoted from the driveway. Ocotillo put a ladder up, lifted tile in three spots and showed me photographs of felt that had turned to dust. Same tile back on, you cannot tell anyone was here.
All reviews
Read the room.
/ 5
From reviews
Tiles show the kind of job, not the customer’s roof.
Straight answers
Because the tile is not the roof. The tile is a rain screen and a sunshade; the layer that actually keeps water out is the underlayment beneath it, and in Arizona heat that has about twenty to twenty-five years in it. The tile really will last fifty years or more, which is why we lift it, replace the paper, and put the same tile back.
Almost always, and we plan on it. We stage it on the roof, work underneath, and re-lay it. Some breakage is normal in handling — we cover up to 5% of the roof from matching stock at our cost, and if your profile is discontinued we find that out before we start, not halfway through.
Lift and re-lay with new underlayment runs $5.50 to $8.50 a square foot of roof. A complete new tile system is $8.50 to $14.00. Architectural shingle is $4.50 to $7.00. A foam recoat is $2.50 to $5.50. Roof area is bigger than floor area — reckon on about 1.15 to 1.2 times your floor plan.
Yes for a re-roof, and no it is not extra. Chandler, Gilbert, Tempe and Mesa all require one, it runs $200 to $600 depending on the town and the roof, and it is inside the number we give you. We pull it and we meet the inspector.
15 June to 30 September officially, and it is the reason we plan tile work around the forecast. A storm cell can arrive in twenty minutes. If we have opened a roof and a storm is coming, we sheet it that evening at no charge — that is our scheduling problem, not your ceiling.
You are never without one. Tile work is done in sections, so part of the roof is always closed in. A typical 2,800 square foot tile re-lay is three to five days on site, and we sheet anything open at the end of every day.
Both, and most East Valley homes need both — a tile field with a flat section over a patio or an addition. The same crew does tile, shingle, foam and coatings, so one firm handles the whole roof rather than two blaming each other at the join.
Yes, and this is a large part of what we do. We will get on it, lift tile, photograph the underlayment and give you a written note of what it needs and roughly what that costs, so you have a real number to take back into the negotiation.
The free look
Three tiles lifted, the underlayment photographed, and a written number before anything is agreed. No charge for the visit.
payments from
/mo
Through our finance partner, subject to approval.