Skip to content
OcotilloRoofing
Inspections inside 48 hrs in season(480) 555-0173Get my free estimateFree estimate
4.9starsfrom 740 reviewsFree roof inspections

Your tile is fine.It is the paper underneath that is failing.

We lift a tile and photograph what is under it before we quote you a number. Nobody should buy a roof on a guess made from the pavement.

A tile roof, in section

  1. Concrete tile50+ years
  2. Battenreusable
  3. Underlayment20–25 yearsThe one that fails
  4. Plywood deckstructural

Everyone buys the top layer. The one in turquoise is the one that decides when your roof needs doing — and it is the only one you have never seen.

East Valley roofs since 2011
From 740 reviews
To an inspection, in season
Workmanship warranty
Two roofers seen from behind laying stacks of terracotta S-tiles on a roof, a palm tree against the skyChandler, AZ

Every quote starts on the roof, not the driveway.

Three lifted tiles, photographed, before we give you a number.

Since 2011

Concrete tile outlives the house. We stage yours on site, re-lay the same tile, and cover breakage from matching stock at our cost up to 5% of the roof. Above that we tell you before we order anything.

  • Our per-square-foot rates are on this website, before you give us a phone number
  • We tell you how many years your underlayment has left, not just what a new roof costs
  • The photographs are yours whether you buy anything or not

Every job comes with

  • Written estimates
  • Photo report after every inspection
  • Monsoon-damage paperwork help
  • Workmanship warranty in writing

Sound familiar?

Pick the one that sounds like yours. Most of them do not mean a new roof, and we will tell you plainly when one does.

Usually a repair

A stain on the ceiling, or a drip when it storms

What it usually is
A cracked flashing, a valley or a slipped tile. Rarely a dead roof.
What we would do
Find the spot, photograph it so you can see it too, and quote the repair. No upsell to a whole roof.

From $3502-5 hours

Water coming in right now?

Move what is underneath, put a container down, and if a ceiling is bulging with trapped water, stay out of that room and call us. Active leaks answered 24/7 through monsoon season, 15 June to 30 September.

(480) 555-0173

Look inside the roof

Every roof is built in layers, and one of them wears out long before the rest. See which one it is on yours, and what replacing it costs.

  1. Pick your kind of roof
  2. Drag the slider to pull it apart
  3. Tap a layer to read about it

Your roof

Building the roof…

The layers, top to bottom

This job: tile lift and re-lay

Wears out first
The underlayment, after about 20–25 years here
We keep
concrete tile and timber battens
We replace
underlayment
Price
$5.50–$8.50 a square foot, so about $11,600–$17,900 for a typical single-storey home (2,100 sq ft of roof)

Tap any layer, on the model or in the list, to see what it does and how long it lasts in Arizona sun.

Before and after

Drag the handle. On the left, the roof we were called to: cracked tiles, slipped courses and gaps the monsoon rain gets into. On the right, the same roof after the repair, every tile whole and every course straight.

After: the same tile roof repaired, every tile whole and every course straight
Before: a tile roof with cracked, slipped and lifted tiles

An illustration made with AI, not a photograph of a customer's home: one scene, shown before and after the kind of tile repair we do.

Before you price anything

Two questions, and you will know whether this is a job for this year or for the next decade. It will happily tell you to go away — most roofs we look at are not ready.

What kind of roof is it?

The clock

The dashed window is when this kind of roof typically needs doing in Arizona — 20 to 25 years.

Put a year in and this will tell you where you stand — including, quite often, that there is nothing to do for years.

This is an estimate from the age of the roof, not a diagnosis. Only lifting tile tells you the truth, and that part is free.

What we do

Press Book this and the service goes straight into the form with the price attached.

  1. 01 / 06

    Tile underlayment replacement

    Your tile lifted, the failed underlayment replaced, the same tile re-laid.

    3-5 days on site

    $11,550 – $28,900

    typical roof

  2. 02 / 06

    New tile roof

    A complete new tile system where the existing tile is past saving.

    5-8 days on site

    $17,850 – $47,600

    typical roof

  3. 03 / 06

    Shingle roof replacement

    Tear-off and replace, for the East Valley homes that were never tiled.

    2-3 days on site

    $9,450 – $23,800

    typical roof

  4. 04 / 06

    Foam and flat-roof recoat

    The flat sections only, recoated properly: cleaned, primed, two coats, measured.

    1-2 days on site

    $750 – $11,000

    typical flat roof

  5. 05 / 06

    Leak and tile repair

    Find it, prove it with photographs, fix it. No upsell to a whole roof.

    2-5 hoursEmergency

    $350 – $2,500

    typical repair

  6. 06 / 06

    Roof inspection

    We lift tile in three places, photograph underneath, and tell you the years left.

    45-75 minutes

    Free

    Book the free look

A working range, from the roof area and the system you have chosen. The written number comes after we have lifted tile and seen the deck, and it normally lands inside this range.

No charge, no obligation

We lift tile in three places, photograph what is underneath, and tell you how many years it has left. You get the photographs whether you buy anything or not.

  • We lift tile in three places
  • Photographs of your underlayment
  • Years-left estimate in writing
  • The photographs are yours either way
  • Morning visits, before the afternoon heat

$11,550 – $28,900

A working range, from the roof area and the system you have chosen. The written number comes after we have lifted tile and seen the deck, and it normally lands inside this range.

Pick a window (optional)

Loading windows…

Free · No obligation

Around Chandler

Three roofers quoted from the driveway. Ocotillo put a ladder up, lifted tile in three spots and showed me photographs of felt that had turned to dust. Same tile back on, you cannot tell anyone was here.
Deb L.Ocotillo, Chandler · Tile underlayment replacement

All reviews

Read the room.

/ 5

From reviews

01 / 04

Tiles show the kind of job, not the customer’s roof.

Straight answers

Still have a question?

Ask here and get a straight answer, or call the office.

(480) 555-0173

Because the tile is not the roof. The tile is a rain screen and a sunshade; the layer that actually keeps water out is the underlayment beneath it, and in Arizona heat that has about twenty to twenty-five years in it. The tile really will last fifty years or more, which is why we lift it, replace the paper, and put the same tile back.

Almost always, and we plan on it. We stage it on the roof, work underneath, and re-lay it. Some breakage is normal in handling — we cover up to 5% of the roof from matching stock at our cost, and if your profile is discontinued we find that out before we start, not halfway through.

Lift and re-lay with new underlayment runs $5.50 to $8.50 a square foot of roof. A complete new tile system is $8.50 to $14.00. Architectural shingle is $4.50 to $7.00. A foam recoat is $2.50 to $5.50. Roof area is bigger than floor area — reckon on about 1.15 to 1.2 times your floor plan.

Yes for a re-roof, and no it is not extra. Chandler, Gilbert, Tempe and Mesa all require one, it runs $200 to $600 depending on the town and the roof, and it is inside the number we give you. We pull it and we meet the inspector.

15 June to 30 September officially, and it is the reason we plan tile work around the forecast. A storm cell can arrive in twenty minutes. If we have opened a roof and a storm is coming, we sheet it that evening at no charge — that is our scheduling problem, not your ceiling.

You are never without one. Tile work is done in sections, so part of the roof is always closed in. A typical 2,800 square foot tile re-lay is three to five days on site, and we sheet anything open at the end of every day.

Both, and most East Valley homes need both — a tile field with a flat section over a patio or an addition. The same crew does tile, shingle, foam and coatings, so one firm handles the whole roof rather than two blaming each other at the join.

Yes, and this is a large part of what we do. We will get on it, lift tile, photograph the underlayment and give you a written note of what it needs and roughly what that costs, so you have a real number to take back into the negotiation.

The free look

Three tiles lifted, the underlayment photographed, and a written number before anything is agreed. No charge for the visit.

$0 down

payments from

/mo

60 months120 months180 months

Through our finance partner, subject to approval.