My tile roof is meant to last fifty years. Why would it need anything at twenty?+
Because the tile is not the roof. The tile is a rain screen and a sunshade; the layer that actually keeps water out is the underlayment beneath it, and in Arizona heat that has about twenty to twenty-five years in it. The tile really will last fifty years or more, which is why we lift it, replace the paper, and put the same tile back.
Can you reuse my existing tile?+
Almost always, and we plan on it. We stage it on the roof, work underneath, and re-lay it. Some breakage is normal in handling — we cover up to 5% of the roof from matching stock at our cost, and if your profile is discontinued we find that out before we start, not halfway through.
What does it actually cost per square foot?+
Lift and re-lay with new underlayment runs $5.50 to $8.50 a square foot of roof. A complete new tile system is $8.50 to $14.00. Architectural shingle is $4.50 to $7.00. A foam recoat is $2.50 to $5.50. Roof area is bigger than floor area — reckon on about 1.15 to 1.2 times your floor plan.
Do I need a permit, and is it extra?+
Yes for a re-roof, and no it is not extra. Chandler, Gilbert, Tempe and Mesa all require one, it runs $200 to $600 depending on the town and the roof, and it is inside the number we give you. We pull it and we meet the inspector.
When is monsoon season, and does it stop the work?+
15 June to 30 September officially, and it is the reason we plan tile work around the forecast. A storm cell can arrive in twenty minutes. If we have opened a roof and a storm is coming, we sheet it that evening at no charge — that is our scheduling problem, not your ceiling.
How long will we be without a roof over our heads?+
You are never without one. Tile work is done in sections, so part of the roof is always closed in. A typical 2,800 square foot tile re-lay is three to five days on site, and we sheet anything open at the end of every day.
Do you do foam roofs, or only tile?+
Both, and most East Valley homes need both — a tile field with a flat section over a patio or an addition. Our CR-42 licence covers tile, shingle, foam and coatings, so one crew handles the whole roof rather than two firms blaming each other at the join.
I am buying a house and the inspection flagged the roof. Can you look before I close?+
Yes, and this is a large part of what we do. We will get on it, lift tile, photograph the underlayment and give you a written note of what it needs and roughly what that costs, so you have a real number to take back into the negotiation.